Ice and Snow Building systems are the main roof, the walls, windows, heating systems, such as a thermal insulation.
(1) Building roof
Ice and Snow Building, the first encounter a house under Snow pressure problems. Therefore, the construction of the Snow slope roofs are often very high, some sharp-shaped roof that is. Now with a pointed roof of the house has been rare, only to see those old antique or old buildings have such a legacy, then the tip-shaped roof is not in order to prevent snow pressure, but to look good or expression A kind of cultural ideas and become a decorative effect on housing from the works of art.
(2) Construction of the wall
Building walls of Ice and Snow from the cold is the role of the insulation. China's Xinjiang's Altay region, where the house was a house from the outside looks great, but after they entered the house, do not think, which is due to the thickness of the walls around Chiban some areas, filling in the dry Houqiang Livestock manure long slow burn in order to achieve the role of heating insulation.
(3) Construction of the windows
The windows of Ice and Snow Building usually used two methods in general, is a narrow window of the size and the other is to increase the level of the window. Because of the construction materials and means of sealing the impact of the northeastern region of the windows of some farm buildings relatively small area. In the window level, both in Northeast China city or village for most of the building double-decker, the difference is that in some townships and towns, some farmers to use wooden boards at the windows across to meet the lighting during the day, at the role of insulation.
(4) Construction of the heating system
A construction, in order to keep the indoor temperature at 20 degrees Celsius, about the natural environment in the snow, alone increased the thickness of walls and narrow windows of the area, improve the sealing of housing is not enough. To maintain a certain temperature, must be in indoor heating, but heating to the time to calculate the length of winter, so Ice and Snow Building in the heating system is essential, and the building itself is organic and linked. |
|