 |
Flood Control Tower

Laying a Solid Foundation for the win time in the tower structure have not made before, as the basis of prefabricated tower of the Zhuang Zi. After the design know, from the Department of endurance and can not see the piling. This by the relevant leading research hat tower construction and general building construction is different it requires the construction of permanent to stand the test of time and history changes. Although it is not piling but can also be built in the earth embankment on the tower, or more unfavorable factors, finally decided to Zhuangzi by 66 meters with a down.
It was a solid basis for so many years Tower can always proud to stand in the banks of the Songhua River.
Spray railings around the original shaft is surrounded by railings, when the initial design and construction is done through the water spray air railings, and the tower is the subject of coordination. But tower near completion, this part of Shuiwen railings were damaged. After the repair, make a simple strip railings, and affected the original design effect. Wang Sheng now also believe that, if re-maintenance, should be restored spray railings.
Sculpture, Tower's eyes - other models sculpture
Soldiers Flood Control Tower model sculpture is an important part of. At that time, not so much in Harbin City sculpture forces. Thus, the construction sector decided to request the Lu Xun Academy of Fine Arts in Shenyang sculpture of the teachers and students back.
The College has sent three teachers, nine college graduates. They work from mid-May to "11" and spent four and a half months time to complete all the tasks of sculpture.
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] |
|